A huge milestone moment is occurring at INK!
Windows were delivered last week and the team has officially begun installing them. Check out this picture of floor two on the north side. ‘Orange’ you glad for the close-up view?
Windows are an important milestone (especially in the winter) because once the exterior is sealed the floor can be heated! That means the team can begin steel stud framing the units without freezing their fingers.
Moving on up the building, rebar is currently being loaded up on the 12th floor in preparation to pour concrete. That means there are only two floors and a roof next to go!
More to come in 2018!
Happy Holidays,
~Catherine
Battistella / Beakerhead Collaboration at INK!
At Battistella Developments, we have been HUGE fans of Beakerhead for years. Every September, they inspire the imaginations ......
INSIDE INK: June 2018 Update
The early summer weather has been a welcomed change at INK. On the exterior, the team ......
INSIDE INK: April 2018 Construction Update
The giant red construction crane that adorned the south side of INK for the last 11 ......